# Gap Analysis: Current vs. Production-Ready **Last Updated:** Feb 1, 2026 **Overall Completion:** ~55% --- ## **Critical Gaps (Blocking Production Release)** ### **1. V1→V2 Migration Incomplete** - **Status:** ❌ **BLOCKING** - **Current:** v2 folders (04-System-Design-Library/, 05-ML-MLOps/, 06-Data/, 07-Infra-DevOps/) have only index stubs - **Legacy exists:** Full content in v1 folders (04-SYSTEM-DESIGN-LIBRARY/, 05-ML-MLOPS/, 06-DATA/, 07-INFRA-DEVOPS/) - **Impact:** Users must navigate two parallel trees; confusing - **Fix:** Copy 18 files from v1 into v2 structure - **Effort:** 1–2 hours ### **2. Real Interview Experiences Missing** - **Status:** ❌ **BLOCKING** - **Current:** [08-Company-Specific-Notes/](08-Company-Specific-Notes/) has only 5 high-level files (40–80 lines each) - **Required:** Google.md, Amazon.md, Meta.md, Apple.md, Netflix.md with: - Actual interview rounds (coding + system design + behavioral) - Common questions + how to approach them - Real feedback snippets ("you talked too fast," "good edge cases") - Company-specific rubrics - **Impact:** Candidates don't know what to actually expect - **Fix:** Create 5 detailed company guides (500–800 lines each) - **Effort:** 4–6 hours ### **3. Study Schedules Not Detailed** - **Status:** ⚠️ **CRITICAL** - **Current:** [06-Study-Plans/](06-Study-Plans/) referenced in README but folder exists only in legacy [08-CAREER/](08-CAREER/) - **Required:** - `junior-3-month-plan.md` (weekly breakdown, daily tasks) - `mid-6-month-plan.md` (weekly breakdown, daily tasks) - `senior-4-month-plan.md` (weekly breakdown, daily tasks) - **Format:** Week-by-week calendar with specific topics + reps - **Impact:** Candidates don't know what to do on Monday - **Fix:** Create 3 detailed schedules (300–400 lines each) - **Effort:** 3–4 hours ### **4. Mock Interview Feedback Templates Missing** - **Status:** ❌ **BLOCKING** - **Current:** [05-Mock-Interviews/](05-Mock-Interviews/) has only stub - **Required:** - Self-evaluation rubric (coding + system design + behavioral) - Peer review template (feedback format) - Post-interview debrief checklist - Video/async interview guide - **Impact:** Candidates can't measure progress - **Fix:** Create 4 templates (200–300 lines each) - **Effort:** 2–3 hours ### **5. Governance Files Missing** - **Status:** ⚠️ **IMPORTANT** - **Current:** No CONTRIBUTING.md, LICENSE, CHANGELOG - **Required:** - `CONTRIBUTING.md` (how to add interview experiences, company-specific tips) - `LICENSE.md` (MIT or CC-BY-4.0) - `CHANGELOG.md` (version history) - `.gitignore` + `git init` setup - **Impact:** Not professionally shareable on GitHub - **Fix:** Create 4 files (~100–200 lines each) - **Effort:** 1–2 hours --- ## **High-Priority Gaps (Significant Content Missing)** ### **6. Real Engineer Quotes + Stories Limited** - **Status:** ⚠️ **HIGH** - **Current:** Mostly references to official docs (TIH, Amazon, Google) - **Missing:** Personal stories, failure cases, unexpected insights - **Examples needed:** - "I failed my first Amazon loop because I didn't ask clarifying questions" → how to avoid - "Meta cares more about tradeoffs than perfect code" → interview insight - "Google's bar raiser round is different; they probe deeper on one topic" - **Fix:** Integrate into company-specific docs (add 10–15 real stories) - **Effort:** 3–4 hours (needs research or crowdsourcing) ### **7. DSA Content Not in V2 Structure** - **Status:** ⚠️ **HIGH** - **Current:** DSA lives in legacy [01-FOUNDATIONS/01-DSA-and-Coding.md](01-FOUNDATIONS/01-DSA-and-Coding.md); referenced in v2 but not expanded - **Missing:** Structured DSA roadmap with: - Topic-by-topic breakdown (arrays, strings, trees, graphs, DP) - Interview patterns (two pointers, sliding window, BFS/DFS, etc.) - Common mistakes (off-by-one, edge cases, complexity errors) - LeetCode problem mapping (which problems test what) - **Fix:** Create v2 DSA folder with 7–8 detailed guides - **Effort:** 4–5 hours ### **8. Resume ATS Optimization Not Detailed** - **Status:** ⚠️ **HIGH** - **Current:** [04-Resume-LinkedIn-GitHub/](04-Resume-LinkedIn-GitHub/) reference in README, but exists only in legacy - **Missing:** - ATS keyword list for each role (backend, MLE, SRE, etc.) - Resume templates with real examples - What kills resumes (common mistakes) - Action verb list + metrics - **Fix:** Create v2 resume section with 3–4 detailed guides - **Effort:** 2–3 hours ### **9. System Design Example Solutions Incomplete** - **Status:** ⚠️ **MEDIUM** - **Current:** [02-System-Design/example-designs/](02-System-Design/example-designs/) mentioned in spec but exists only as legacy - **Missing:** Deep dive for URL shortener, news feed, chat, rate limiter, file storage - **Current in legacy:** Generic templates but not real solutions - **Fix:** Write 5 example solutions (300–400 lines each) - **Effort:** 4–6 hours ### **10. Company Leveling + Salary Context** - **Status:** ⚠️ **MEDIUM** - **Current:** [08-Company-Specific-Notes/05-Geography-Leveling.md](08-Company-Specific-Notes/05-Geography-Leveling.md) exists but is bare - **Missing:** - IC level definitions (IC1→IC7) - What each level expects in interviews - Approximate salary ranges (anonymized data) - How to negotiate level - **Fix:** Expand 05-Geography-Leveling.md (500+ lines) - **Effort:** 2–3 hours --- ## **Lower-Priority Gaps (Nice-to-Have)** ### **11. Negotiation Specifics by Company** - **Status:** ℹ️ **NICE-TO-HAVE** - **Current:** [07-Offer-Negotiation/](07-Offer-Negotiation/) referenced in legacy but sparse - **Missing:** Company-by-company negotiation tactics (Google vs Amazon vs Meta equity terms) - **Effort:** 2 hours ### **12. Interview Day Logistics Checklist** - **Status:** ℹ️ **NICE-TO-HAVE** - **Current:** Basic coverage in [03-INTERVIEWS/09-Interview-Day-Operations.md](03-INTERVIEWS/09-Interview-Day-Operations.md) - **Missing:** Equipment checklist, timezone management, backup plans - **Effort:** 1 hour ### **13. Post-Interview Analysis Template** - **Status:** ℹ️ **NICE-TO-HAVE** - **Current:** Not present - **Missing:** How to reflect on interviews and iterate - **Effort:** 1 hour --- ## **Fix Priority Order (Recommended)** | # | Gap | Effort | Impact | Do First? | | --- | -------------------------- | ------ | --------- | --------- | | 1 | V1→V2 migration | 1–2h | CRITICAL | ✅ YES | | 2 | Real interview experiences | 4–6h | CRITICAL | ✅ YES | | 3 | Study schedules (detailed) | 3–4h | CRITICAL | ✅ YES | | 4 | Mock interview templates | 2–3h | CRITICAL | ✅ YES | | 5 | Governance files | 1–2h | IMPORTANT | ✅ YES | | 6 | DSA v2 structure | 4–5h | HIGH | ⏭️ NEXT | | 7 | Resume ATS optimization | 2–3h | HIGH | ⏭️ NEXT | | 8 | Real engineer stories | 3–4h | HIGH | ⏭️ NEXT | | 9 | System design examples | 4–6h | MEDIUM | ⏭️ NEXT | | 10 | Leveling + salary context | 2–3h | MEDIUM | ⏭️ NEXT | **Total Effort to Production:** ~25–35 hours --- ## **Success Criteria (Definition of "Done")** ✅ No v1/v2 duplication confusion ✅ All 5 company guides completed (Google/Amazon/Meta/Apple/Netflix) ✅ Study schedules include daily tasks ✅ Mock interview templates have real rubrics ✅ `git init` + CONTRIBUTING.md live ✅ All internal links verified ✅ No placeholders or "TODO" markers